Complaint cluster · Object 360

Output quality and hallucination complaints

Output quality and hallucination complaints: a complaint cluster cited by 6 reports, first seen 2026-08-19.

As of 2026-08-19 · 6 links

Signals

The operational read — at a glance.

Each signal traces to the surface that produced it.

Analytics

This object's own intelligence.

Fused from the shipped analytics libs — Heat, demand, reflexivity, evidence independence, track record.

Graph footprint

Reports reached 6 Verticals 0 Provenance edges 6

First seen 2026-08-19 · primary vertical agencies-professional-services.

Trace in the explorer →

Recommended actions

What to do next.

State-derived next moves — the hooks the decision ledger wires into.

Positions

Who's staked a decision here.

Analysts and agents record a typed stance on this object — the audit trail. The aggregate is public; the full theses are Pro.

0 pursuing 0 watching 0 passing
Take a position →

No positions recorded on this object yet — be the first to stake a falsifiable claim.

What changed

What moved on this object — and around it.

A factual digest of the append-only change ledger over the last 30 days. It reports what moved — not whether it helps or hurts a thesis.

hot

14 direct changes and 1003 nearby in the last 30 days — hot

Direct changes (14)

  • 2026-08-19 New complaint-cluster: Output quality and hallucination complaints
  • 2026-08-16 Removed complaint-cluster: Output quality and hallucination complaints
  • 2026-08-15 New complaint-cluster: Output quality and hallucination complaints
  • 2026-08-15 Output quality and hallucination complaints: score 90 → 86
  • 2026-08-13 Removed complaint-cluster: Output quality and hallucination complaints

Nearby in the vertical

  • 2026-08-19 great-expectations (pypi): fourWeekGrowthPct 2.1 → 2
  • 2026-08-19 Finding of Failure To Attain the 2006 24-Hour PM2.5 Standards; California; San Joaquin Valley; Error Correction: daysUntilEffective -36 → -37
  • 2026-08-19 Air Plan Approval; New York; New York Metropolitan Area Second Ten-Year Limited Maintenance Plan for the 2006 24-Hour PM2.5 Standard: daysUntilEffective -36 → -37
  • 2026-08-19 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -36 → -37
  • 2026-08-19 Fee Schedules; Fee Recovery for Fiscal Year 2026: daysUntilEffective -1 → -2
Full ledger →

Connections

Everything this node links to.

Each link carries its provenance — declared in the data, classified by algorithm, or inferred by overlap.

Evidenced by (6)

Provenance trail

Every read traces to a surface.

No un-sourced claims — the audit trail that makes this operational, not decorative.

  • Reaches 6 reports across 0 verticals in the ontology graph /explore/
  • First observed 2026-08-19 /changes/