Regulation · Object 360

NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War

NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War: a regulation cited by 4 reports, first seen 2026-10-28.

As of 2026-10-28 · 4 links

Signals

The operational read — at a glance.

Each signal traces to the surface that produced it.

Analytics

This object's own intelligence.

Fused from the shipped analytics libs — Heat, demand, reflexivity, evidence independence, track record.

Graph footprint

Reports reached 4 Verticals 0 Provenance edges 4

First seen 2026-10-28 · primary vertical business-operations.

Trace in the explorer →

Recommended actions

What to do next.

State-derived next moves — the hooks the decision ledger wires into.

Positions

Who's staked a decision here.

Analysts and agents record a typed stance on this object — the audit trail. The aggregate is public; the full theses are Pro.

0 pursuing 0 watching 0 passing
Take a position →

No positions recorded on this object yet — be the first to stake a falsifiable claim.

What changed

What moved on this object — and around it.

A factual digest of the append-only change ledger over the last 30 days. It reports what moved — not whether it helps or hurts a thesis.

hot

4 direct changes and 713 nearby in the last 30 days — hot

Direct changes (4)

  • 2026-10-28 NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War: daysUntilEffective 29 → 28
  • 2026-10-27 NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War: daysUntilEffective 30 → 29
  • 2026-10-26 NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War: daysUntilEffective 31 → 30
  • 2026-10-25 New regulation: NRC Reviews of Reactor Designs Previously Authorized by U.S. Department of Energy or Department of War

Nearby in the vertical

  • 2026-10-28 Establishment of Class E Airspace; Canton, OH: daysUntilEffective 2 → 1
  • 2026-10-28 Establishment of Class E Airspace; Freer, TX: daysUntilEffective 2 → 1
  • 2026-10-28 Establishment of Class E Airspace; Mullin, TX: daysUntilEffective 2 → 1
  • 2026-10-28 Priority Mail Express and Priority Mail Open and Distribute Parcel Mailings Discontinued: daysUntilEffective 82 → 81
  • 2026-10-28 Establishment of Class E Airspace; Rosenberg, TX: daysUntilEffective 2 → 1
Full ledger →

Connections

Everything this node links to.

Each link carries its provenance — declared in the data, classified by algorithm, or inferred by overlap.

Provenance trail

Every read traces to a surface.

No un-sourced claims — the audit trail that makes this operational, not decorative.

  • Reaches 4 reports across 0 verticals in the ontology graph /explore/
  • First observed 2026-10-28 /changes/