Adoption signal · Object 360

great-expectations (pypi)

great-expectations (pypi): a adoption signal cited by 31 reports, first seen 2026-05-18.

As of 2026-08-18 · 31 links

Signals

The operational read — at a glance.

Each signal traces to the surface that produced it.

Analytics

This object's own intelligence.

Fused from the shipped analytics libs — Heat, demand, reflexivity, evidence independence, track record.

Graph footprint

Reports reached 31 Verticals 0 Provenance edges 31

First seen 2026-05-18 · primary vertical agencies-professional-services.

Trace in the explorer →

Recommended actions

What to do next.

State-derived next moves — the hooks the decision ledger wires into.

Positions

Who's staked a decision here.

Analysts and agents record a typed stance on this object — the audit trail. The aggregate is public; the full theses are Pro.

0 pursuing 0 watching 0 passing
Take a position →

No positions recorded on this object yet — be the first to stake a falsifiable claim.

What changed

What moved on this object — and around it.

A factual digest of the append-only change ledger over the last 30 days. It reports what moved — not whether it helps or hurts a thesis.

hot

18 direct changes and 983 nearby in the last 30 days — hot

Direct changes (18)

  • 2026-08-18 great-expectations (pypi): fourWeekGrowthPct 1.6 → 2.1
  • 2026-08-17 great-expectations (pypi): fourWeekGrowthPct 1 → 1.6
  • 2026-08-15 great-expectations (pypi): fourWeekGrowthPct 0.3 → 1
  • 2026-08-13 great-expectations (pypi): fourWeekGrowthPct 1.7 → 0.3
  • 2026-08-11 great-expectations (pypi): fourWeekGrowthPct 1.6 → 1.7

Nearby in the vertical

  • 2026-08-18 Finding of Failure To Attain the 2006 24-Hour PM2.5 Standards; California; San Joaquin Valley; Error Correction: daysUntilEffective -35 → -36
  • 2026-08-18 Air Plan Approval; New York; New York Metropolitan Area Second Ten-Year Limited Maintenance Plan for the 2006 24-Hour PM2.5 Standard: daysUntilEffective -35 → -36
  • 2026-08-18 Partial Withdrawals of Findings of Failure To Submit State Implementation Plan (SIP) Revisions To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction: daysUntilEffective -35 → -36
  • 2026-08-18 Fee Schedules; Fee Recovery for Fiscal Year 2026: daysUntilEffective 0 → -1
  • 2026-08-18 Completed Inspection Report Disposition: daysUntilEffective -26 → -27
Full ledger →

Connections

Everything this node links to.

Each link carries its provenance — declared in the data, classified by algorithm, or inferred by overlap.

Adopted by (31)

Provenance trail

Every read traces to a surface.

No un-sourced claims — the audit trail that makes this operational, not decorative.

  • Reaches 31 reports across 0 verticals in the ontology graph /explore/
  • First observed 2026-05-18 /changes/